Builders temporary supply

Do you need a builders temporary supply? 

MainPower does not provide MainPower-owned builders temporary supplies.

Your electrician or an approved provider from the list below can arrange a builders temporary supply with MainPower.

Please complete the application form below to request a temporary connection.

Apply for a builders temporary supply connection

Builders Temporary Supply application form

Complete the application form below to connect a builders temporary supply to the MainPower network.

Approved builders temporary supply providers

Please note, there may be a charge for processing a new connection. All costs for temporary power are the responsibility of the customer.

SafePower Services
Jamie Nutbrown Electrical

0800 563 583
022 069 6107
jamienutbrownelectrical@gmail.com

Wilpower Electrical Ltd
Vector Electrical Services (previously Vircom EMS)
Hanmer Alpine Electrical & Air Conditioning

Office: 03 315 7955
After hours: 027 441 3101
andy.ockwell@alpineelectrical.nz
www.alpineelectrical.nz
Areas serviced: Hanmer, Lyford, Rotherham, Waiau, Culverden, Engineers Camp, Harwarden, Waikari, Cheviot, and Maruia township.

We’re here to help

If you need some assistance or advice, please get in touch with our team.

Important notifications

Hot water load testing under way ahead of winter

Until mid‑April, we’re working closely with retailers to carry out hot water load testing as we prepare our network for the coming winter season.

These tests run for a couple of hours each day, Monday to Friday, with no testing taking place over weekends. Because each test window is relatively short, customers are unlikely to notice any changes to their hot water supply.

The purpose of this work is to help us better understand how much controllable load is available during the summer months. Gaining accurate insights now means we can model customer savings more effectively by reducing system load at peak times. It also helps us assess whether this load flexibility could assist Transpower in deferring an upcoming local transmission upgrade.

This testing is an important part of ensuring a resilient, efficient network that supports our community.

MainPower Trust elections

Voting is open for the 2026 MainPower Trust election.

Voting packs have been emailed or posted by Electionz.com to everyone who pays a power bill on the MainPower network. You need to have the unique ID provided to cast your vote.

If you haven’t received a voting pack, or can’t find it, you can get a replacement by contacting iro@electionz.com.  For full details of the candidates, visit mainpowertrust.co.nz/trustee-elections/

Make the most of this opportunity to have your say on the future of MainPower – and your community.

Voting closes midday Friday 6 March 2026. 

Privacy Policy

Unplanned outage

Fault – Hanmer Springs / Lewis Pass
MainPower is aware of a fault affecting the Hanmer Springs and Lewis Pass areas. Our crews are currently on site at the fault location. Restoration is estimated to be early this evening.
We will continue to provide updates as more information becomes available. Please treat any fallen or damaged lines as live and maintain a 10 meter distance.

Is your outage not listed?

Troubleshoot your outage
Treat all lines as live during the outage period; power may be restored at any time. If you require further information, please call MainPower’s 24-hour faults line. To report an emergency, call 111.

Outage notifications

Hot water load testing under way ahead of winter

Until mid‑April, we’re working closely with retailers to carry out hot water load testing as we prepare our network for the coming winter season.

These tests run for a couple of hours each day, Monday to Friday, with no testing taking place over weekends. Because each test window is relatively short, customers are unlikely to notice any changes to their hot water supply.

The purpose of this work is to help us better understand how much controllable load is available during the summer months. Gaining accurate insights now means we can model customer savings more effectively by reducing system load at peak times. It also helps us assess whether this load flexibility could assist Transpower in deferring an upcoming local transmission upgrade.

This testing is an important part of ensuring a resilient, efficient network that supports our community.

MainPower Trust elections

Voting is open for the 2026 MainPower Trust election.

Voting packs have been emailed or posted by Electionz.com to everyone who pays a power bill on the MainPower network. You need to have the unique ID provided to cast your vote.

If you haven’t received a voting pack, or can’t find it, you can get a replacement by contacting iro@electionz.com.  For full details of the candidates, visit mainpowertrust.co.nz/trustee-elections/

Make the most of this opportunity to have your say on the future of MainPower – and your community.

Voting closes midday Friday 6 March 2026. 

Privacy Policy

Unplanned outage

Fault – Hanmer Springs / Lewis Pass
MainPower is aware of a fault affecting the Hanmer Springs and Lewis Pass areas. Our crews are currently on site at the fault location. Restoration is estimated to be early this evening.
We will continue to provide updates as more information becomes available. Please treat any fallen or damaged lines as live and maintain a 10 meter distance.

Is your outage not listed?

Troubleshoot your outage
Treat all lines as live during the outage period; power may be restored at any time. If you require further information, please call MainPower’s 24-hour faults line. To report an emergency, call 111.

Quick links