Board of Directors

On this page

Our Board of Directors oversee MainPower’s strategic direction, ensuring accountability and transparency.

They provide guidance on governance and on financial and risk management while representing shareholder interests, making key decisions, and evaluating executive performance to achieve long-term goals.

We’re here to help. Get in touch if you need help. Or, check out our FAQs.

Board of Directors

We’re here to help

If you need some assistance or advice, please get in touch with our team.

Outage notifications

Raramai Tunnel works, SH1, Peketā

MainPower will be carrying out essential network upgrade work at the Raramai Tunnel next week. This work will require single lane stop/go traffic management with potential road closures (maximum 20 minute duration) that may affect travel plans for some of our customers. 

Location: Raramai Tunnel, SH1, Peketā

  • Monday 9 to Wednesday 11 February: Parking bays and the pedestrian walkway north of the tunnel will be closed for equipment laydown and construction. 
  • From 6.00am Tuesday 10 to 8.00pm Thursday 12 February: Stop/go traffic management will be in place with traffic reduced to one lane through the tunnel to support helicopter and construction activity. Stop/go will remain overnight, controlled by lights.

Timings may vary due to weather. Motorists should expect delays and are encouraged to plan ahead or use alternative routes..

Is your outage not listed?

Troubleshoot your outage
Treat all lines as live during the outage period; power may be restored at any time. If you require further information, please call MainPower’s 24-hour faults line. To report an emergency, call 111.

Outage notifications

Raramai Tunnel works, SH1, Peketā

MainPower will be carrying out essential network upgrade work at the Raramai Tunnel next week. This work will require single lane stop/go traffic management with potential road closures (maximum 20 minute duration) that may affect travel plans for some of our customers. 

Location: Raramai Tunnel, SH1, Peketā

  • Monday 9 to Wednesday 11 February: Parking bays and the pedestrian walkway north of the tunnel will be closed for equipment laydown and construction. 
  • From 6.00am Tuesday 10 to 8.00pm Thursday 12 February: Stop/go traffic management will be in place with traffic reduced to one lane through the tunnel to support helicopter and construction activity. Stop/go will remain overnight, controlled by lights.

Timings may vary due to weather. Motorists should expect delays and are encouraged to plan ahead or use alternative routes..

Is your outage not listed?

Troubleshoot your outage
Treat all lines as live during the outage period; power may be restored at any time. If you require further information, please call MainPower’s 24-hour faults line. To report an emergency, call 111.

Quick links