Getting Connected


MainPower staff are keen to ensure that your experience in connecting your installation to the MainPower network is easy, fast and friendly. We need you to fill out one of the application forms provided and to get it to us with as much forward notice as possible. Once we get your application we check to see if a suitable power supply is available to your site and then organize our contractors to carry out the connection. If power is not readily available we will arrange for a new power design and a free quotation for your power supply.


New Temporary Supply or Permanent Final Connection

Click here to apply for a new temporary supply or a permanent final connection to MainPower's distribution network.

Connection Process

View the Connection Process chart to understand the processes involved with getting connected for new buildings.

At any time you can make contact with the parties shown in order to check the progress on your connection.

Network Extension Policy

The Network Extension Policy applies for all high voltage extensions to MainPower's network commissioned on private property.

 

Links referenced
here
http://www.mainpower.co.nz/index.cfm/1,369,0,-1,html/Connection-Form
Connection Process
http://www.mainpower.co.nz/index.cfm/3,129,262/powerconnectionchart08.pdf
Network Extension Policy
http://www.mainpower.co.nz/index.cfm/3,129,262/networkextensionpolicy.pdf

Location http://www.mainpower.co.nz/index.cfm/1,129,0,43,html


MainPower New Zealand Limited and UtilityOnline

5 High Street
PO Box 346
Rangiora 7440
New Zealand

Ph 03 311 8300
Fax 03 311 8301

Email info@mainpower.co.nz

Faults within the MainPower area: Ph 0508 60 70 80