The following information applies to customers who generate their own electricity on-site via a small scale generator (10 kilowatts or less) which is, or can be, connected to MainPower's electricity network.
Step 1: Read the following documentation thoroughly
Step 2: Fill in the following forms
Step 3: MainPower will contact you to confirm reciept of your connection notification and if correctly completed, grant final approval.
Step 4: Connect your distributed generation system to MainPower's network.
Step 5: Notify MainPower of your connection
Location http://www.mainpower.co.nz/index.cfm/1,175,0,42,html
Copyright © Mainpower 2012
|
MainPower New Zealand Limited and UtilityOnline 5 High Street Ph 03 311 8300 Email info@mainpower.co.nz Faults within the MainPower area: Ph 0508 60 70 80 |