Loading...

24 Hour
Faults
0508 60 70 80
  • MainPower

  • Outages
    • Outages
    • Outages FAQs
    • Planned Outages
    • Unplanned Outages
    • Medically Dependent Customers
  • Get Connected
    • Get Connected
    • FAQs
    • Apply Online
    • How to Get Connected
    • Request a New Power Supply
    • Distributed Generation
    • Network Pricing
    • Information for Developers
    • Harmonics Standard
    • Customers
    • Capacity increase FAQs
  • Safety
    • Safety
    • Safety First
    • Safety at Home
    • Trees and Power Lines
    • Electromagnetic Fields
    • Safety Around the Network
  • Community
    • Community
    • Sponsorships
    • Scholarships
    • Education
    • Community Fund
  • About
    • About
    • Our Business
    • Our People
    • Our Network
    • Renewable Generation
    • Careers
    • MainPower Trust
    • Disclosures
    • Credit Terms
    • Electricity Retailers
  • Contact
    • Contact
    • Latest News
    • Compliments & Concerns
    • Community Consultation - MPower Us

Export Constraints

  1. Home
  2. Get Connected
  3. Distributed Generation
  4. Export Constraints

Mt Cass Road - east of the confluence of Omihi Creek and the Waipara River

In this section

  • FAQs
  • Apply Online
  • How to Get Connected
  • Request a New Power Supply
  • Distributed Generation
    • Distributed Generation 10kW or less
    • Distributed Generation Greater than 10kW
    • Technical Standards
    • Safety Requirements
    • Export Constraints
  • Network Pricing
  • Information for Developers
  • Harmonics Standard
  • Customers
  • Capacity increase FAQs
power

Power
Outages

More info

plug

Get
connected

More info

phone

General
enquiries

More info

Load Shedding: 0%
Updated: 20/12/2019 9:01 a.m.
Report faults within the MainPower area 0508 60 70 80 General Enquiries 03 311 8300 Fax 03 311 8301 I have a complaint
Mainpower
© MainPower Limited 2019Website by Plato Creative

Load Shedding

When MPNZ's load shedding percentage exceeds 75%, the bar on the graph should move into a red zone. It signals the USI transmission grid is approaching peak loading and as MPNZ's load shedding percentage approaches 100% there is a reasonable likelihood of new chargeable peak periods occurring.

When the end of the bar is red MPNZ is deploying its maximum load control capability (100%).  The longer MPNZ load shedding remains at 100% the more likely new chargeable peak periods will occur on the USI grid. This forms a reasonable signal for consumers to manage their load and to continue doing so until the bar on graph moves down from 100% and ceases to be red at the end.

When the whole bar is white (0%) MPNZ is not controlling any load and the grid will be operating at normal load levels. This bar is updated every 5 minutes.

×