Load Shedding:
When MPNZ's load shedding percentage exceeds 75%, the bar on the graph should move into a red zone. It signals the USI transmission grid is approaching peak loading and as MPNZ's load shedding percentage approaches 100% there is a reasonable likelihood of new chargeable peak periods occurring.
When the end of the bar is red MPNZ is deploying its maximum load control capability (100%). The longer MPNZ load shedding remains at 100% the more likely new chargeable peak periods will occur on the USI grid. This forms a reasonable signal for consumers to manage their load and to continue doing so until the bar on graph moves down from 100% and ceases to be red at the end.
When the whole bar is white (0%) MPNZ is not controlling any load and the grid will be operating at normal load levels. This bar is updated every 5 minutes.
Load Shedding Percentage: %
Updated at:
If you will be affected by a planned outage, your electricity retailer will send you a letter in advance, so you can make other arrangements.
Planned outages are also listed on our website, visit the planned outages page.
To report a fault call MainPower on 0508 60 70 80.
If a major outage occurs please see our Unplanned Outages page for updates.
Special consideration is given to the continuity of supply to customers whose health or livelihood could be adversely affected by an interruption. Priority customers include those who maintain essential services as well as medically dependent customers.
Customers with serious medical conditions, who rely on continuity of supply to support life, are treated as priority customers. Every effort is made to maintain continuity of supply and, if necessary, to advise them of any interruptions to supply so that alternate arrangements can be made. If you are a medically dependent customer, please ensure we are aware of your needs. You can provide this information online. Or, contact us on 03 311 8300.